Customization: | Available |
---|---|
Classification: | Imaging Diagnostic Equipment |
Type: | Sleep Monitor |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The SY-C038 device is applied for the suffers with such diseases as OSAHS(obstructive sleep apnea-hypopnea syndrome), COPD(chronic obstructive pulmonary diseases)and vascular diseases, also for the persons over 60 years .It can be used in hospital or at home.
Wrist-equipment,tiny and light
Convenient operation
Display of SpO2 ,pulse rate ,pulse waveform and nose flow waveform
Alarms for low-power, finger-out and exceeding limits
Adjustable screen brightness
Real-time clock
Time power on/off and manual power on/off
TF card multi-case record
Data uploaded by internal card reader
PC analysis software
SpO2:
Measuring range: 35%~100%
Accuracy: 70%~100% ,±2% ;<70% unspecified
Pulse Rate
Measuring range: 30bpm~250bpm
Accuracy: ±2 bpm or ±2%(select larger)
Nose air flow measure
Measuring range:0rpm~120rpm
Accuracy: ±2rpm
Power Supply : ONE 3.7V Lithium Battery
Display : 1.8" color OLED
Dimension:69mm(L)× 50mm(W)×17.3mm (H)
Accessories
A power adaptor
An USB data line
Two SpO2 probes
A nose-oxygen tube
A CD (PC software)
An user manual
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.