Customization: | Available |
---|---|
Classification: | Imaging Diagnostic Equipment |
Type: | X Ray Equipment |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Featureof Digital X-Ray Equipment for Radiography:
High Frequency High Voltage X-ray Generator
X-ray Tube Assembly Made-in-China
Collimator
Digital Detector Rayence 1717SGC/SCC Made-in-Korea
DR Machine Frame
Radiography Table
Computer and LCD DCSM1F/ML2002
Synchronous box
High Voltage Cable 75kV (length: 8m)
Grid (Brand:JPI) 100cm and 180cm Made-in-Korea
Specification of Digital X-Ray Equipment's Generator:
Power AC380V ± 38V |
Radiography Tube Voltage 40kV ~ 150kV |
Radiography Tube Current 10mA ~ 630mA |
Time 2ms ~ 6300ms |
Allowed Internal Resistance 380V: 0.5Ω |
Allowed Frequency Variation 50Hz/60Hz ± 1Hz |
Working Frequency ≥30kHz |
Focus |
0.6mm/1.2mm |
Rotating Speed |
2800rpm |
Peek Tube Voltage |
150kV |
Small Focus |
20kW |
Large Focus |
50kW |
Scanning Area |
17 × 17 inches |
Spatial Resolution |
not less than 3.9lp/mm |
Total Pixel Matrix |
3,328(h) × 3,328(v) |
Pexel Pitch |
127 |
Image Preview Time |
not more than 2s |
Picture of Digital X-Ray Equipment:
Other related products/Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.