Sy-B041 China Cheap ESR Machine Medical Hospital ESR Analyzer

Classification: Biological Diagnostics
Type: Biochemistry Analyzer
Certification: CE
Area of Application: Erythrocyte Sedimentation Rate Analysis
Measuring Principle: Infrared Sensor
Reading Channels: 30 Available Channels
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
SY-B041
Loading Capability
up to 30 Samples at a Time
Net Weight
11.5kg
Transport Package
Carton Box
Specification
400mm*300mm*200mm
Trademark
Sunnymed
Origin
China
Production Capacity
200 Set/Month

Product Description

SY-B041 China Cheap ESR Machine Medical Hospital ESR Analyzer

Feature of ESR Analyzer:

Random access
Up to 30 samples can be scanned simultaneously
Throughput: up to 60 samples /hour 
Temperature compensation refer to 18oC according to Westergren method
ESR curve display and print-out
Touch screen , large LCD display
Built-in internal thermal recorder

Specification of ESR Analyzer:
 
Measuring time:30 minutes or 60 minutes selectable
Throughput: Up to 60 samples per hour
Result resolution:1mm/1h
Blood level range:50mm~64mm
Power supply: AC 220V/110V ±10%, 50/60/Hz, 50W
Operation conditions:Temperature 15C°~32°C Humidity ≤85%
Net weight :11.5kg

Picture of ESR Analyzer:


Sy-B041 China Cheap ESR Machine Medical Hospital ESR Analyzer
 

Main products:
Sy-B041 China Cheap ESR Machine Medical Hospital ESR Analyzer


FAQ:

Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
 
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
 

Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
 
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The 
price will be adjusted appropriately as the price fluctuation of raw material in 
the market.
 
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about 
7-10 days to finish the production.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now