Sy-U001 200L Blood Fridge Medical Freezer Vaccine Refrigerator

Certification: CE, ISO13485
Scale: Medium
Type: Cryobiology Cooling Device
Volume: 120L, 200L, 350L, 650L, 950L
Maintain The Temperature: 2-8 Degree
Temperature Set Value: 0-14 Degree
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
SY-U001
Display Precision
0.1 Degree
Power Supply
220V
Transport Package
Wooden Case
Trademark
Sunnymed
Origin
China
Production Capacity
300 Set/Month

Product Description

SY-U001 200L Blood Fridge Medical Freezer Vaccine Refrigerator

Feature of vaccine refrigerator:
The medicine refrigerator is the specific medicine cold-storage equipment.
 It can be also used for storing reagent, vaccine, biological product, etc.
 It is especially available for hospital, pharmacy, pharmaceutical factory, epidemic station, blood bank station, 
 health center and lab.  

Specification of vaccine refrigerator:
 
Precise temperature control system 
24-hours tracing, recording and printing system
The display precision resolution is 0.1°C.
Wide voltage band is available for 187-242V voltage
Safe control system


Picture of vaccine refrigerator :
Sy-U001 200L Blood Fridge Medical Freezer Vaccine Refrigerator

 

Other related products/Main products:

Sy-U001 200L Blood Fridge Medical Freezer Vaccine Refrigerator


FAQ:

Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
 
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
 

Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
 
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The 
price will be adjusted appropriately as the price fluctuation of raw material in 
the market.
 
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about 
7-10 days to finish the production.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now