Customization: | Available |
---|---|
Type: | Catheter |
Material: | Plastic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Catheter:
Special PUR material with great biocompatibility avoids catheter adhere and block; the catheter is soft with small irritation and great crease resistance. It can soften in human body so the patients can feel more comfortable.
Catheter Tube:The catheter tube is radiopaque under X-ray and graduation marked, so it is easy to master the depth of the catheter placement.
Catheter Placement:The catheter placement operation is safer to reduce the chance of infection during minimally invasive surgery with guidewire use. The guidewire front end is naturally curved so it is not easy to injure splanchnocoele viscera.
Catheter Front End:The catheter front end has two different designs. 1.Straight design. 2. Pigtail twisted design with smooth built-in and outside and additional side hole on the low-lying side. This design can avoid catheter wall sucked and blocked, and it can increase drainage area.
Specification of Medical Disposable DC Puncture Kit Medical Drainage Catheter Pigtail Kit:Standard Kits include:
1. Drainage Catheter |
Optional Compound Kits include:
1. Drainage Catheter |
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.