Customization: | Available |
---|---|
Classification: | Physiological Functions of Diagnosis and Monitoring Equipment |
Type: | Aed |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
AED Defibrillator: |
|
Output |
Biphasic Truncated Exponential |
Energy Sequence |
150, 150, 200J |
Charge Time |
8 sec. to 150J; 10 sec. to 200J (New Battery) |
Analysis Time |
9 sec. |
The maximum time from the initiation of rhythm analysis to readiness for discharge with a new battery |
|
The maximum time from the initiation of rhythm analysis to readiness for discharge after 6 shocks |
Less than 35 seconds |
The maximum time from initially switching power on to readiness for discharge |
Less than 25 seconds |
Audible Prompts |
22 audible prompts |
Visual Prompts |
LED prompts |
Controls |
Two buttons-ON/Off, Shock |
Output Energy Accuracy |
±15% into any impedance from 25 to 175Ω |
The Maximum Voltage |
1200±50V |
Output disabled when the patient impedance is outside limits |
20Ωto 200Ω |
Physical: |
|
Dimensions |
303*216*89mm |
Weight |
2.0kg |
Operating Temperature |
0°C to 40°C |
|
Relative humidity between 30% and 95% (non-condensing) |
Storage Temperature (without battery) |
-20°C to 55°C |
Storage Humidity (without battery) |
Up to 95% (non-condensing) |
Packaging size: |
43x25x32cm |
G.W. |
4KG |
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.