Customization: | Available |
---|---|
Classification: | Aed |
Type: | Aed |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Brief Introduction:
Defibrillator
|
|
Output
|
Biphasic Truncated Exponential
|
Energy Sequence
|
150, 150, 200J
|
Charge Time
|
8 sec. to 150J; 10 sec. to 200J (New Battery)
|
Analysis Time
|
9 sec.
|
The maximum time from the initiation of rhythm analysis to readiness for discharge with a new battery
|
Less than 30 seconds
|
The maximum time from the initiation of rhythm analysis to readiness for discharge after 6 shocks
|
Less than 35 seconds
|
The maximum time from initially switching power on to readiness for discharge
|
Less than 25 seconds
|
Audible Prompts
|
22 audible prompts
|
Visual Prompts
|
LED prompts
|
Controls
|
Two buttons-ON/Off, Shock
|
Output Energy Accuracy
|
±15% into any impedance from 25 to 175Ω
|
The Maximum Voltage
|
1200±50V
|
Output disabled when the patient impedance is outside limits
|
20Ωto 200Ω
|
Battery
|
|
Part No.
|
CR123A-4*2
|
Non-rechargeable
|
12V DC, 2.8Ah
|
Capacity
|
At 150 Joules
|
Physical
|
|
Dimensions
|
303*216*89mm
|
Weight
|
2.0kg
|
Operating Temperature
|
0°C to 40°C
|
Operating Humidity
|
Relative humidity between 30% and 95% (non-condensing)
|
Storage Temperature (without battery)
|
-20°C to 55°C
|
Storage Humidity (without battery)
|
Up to 95% (non-condensing)
|
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.
We are based in Guangdong, China, starting from 2014. Products are sold to South America, Southeast Asia, North America, and Africa, ect. .