Customization: | Available |
---|---|
Classification: | Imaging Diagnostic Equipment |
Type: | Digital Imaging System |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Imported key component:adopted imported medical LED,Strong stability,Good anti-seismic property.
2. Long service life:working time more than 20 thousand -40 thousand hours,minimizing the need to replace the bulb,cost saving.
3. Colour temperature purity:Natural light 6500K,no stray lights.
4. High brightness: great transparency,Excellent color rendering,great three -dimensional sense of the surgery.
5. Good compatibility:International standard light guide cable,like Storz,Olympus,Wolf etc.
Specification of light source:
Input power |
50VA |
Power supply |
AC100-240V 50/60Hz |
Light source |
LED light |
Effective optical power |
≥100mW |
Brightness/Lux |
≥490000lx |
Color temperature |
≥6500K |
Noise |
≤55dB(A) |
Surface temperatures |
≤60ºC |
Flat thermal of light source |
≤80ºC |
Working environment |
5ºC~40ºC |
Atmospheric pressure |
860hPa~1060hPa |
Machine power |
50VA |
Host fuse |
T2AL 250V AC |
Light power |
≥100mW |
Light out |
Diameter10±0.10mm |
Other related products/Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.