Customization: | Available |
---|---|
Classification: | Physiological Functions of Diagnosis and Monitoring Equipment |
Type: | Fetal Monitor |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Fetal Heart Rate Multi-crystal,pulsed doppler,high sensitive
Transducer Strengh <5mW/cm2
Working frequency 1.0MHz
Signal processing special DSP system and mode recognization
Measurement range 50~210 bpm
Alarm Range: High: 160 170 180 190 bpm
Low : 90 100 110 120 bpm
The largest audio output power 1.5W
TOCO
Measurement range 0~100units
Battery working time 2 hours(no printer working)
Speaker 1W
Power Supply AC 220V±20%,50Hz or 8.4V Li-battery
Power consumption <20W
Working Environment Temperature: 10~40 ºC, RH: 10~80%
Transducer Acoustic Output Under the requirements laid down in IEC 1157, 1992, the peak negative acoustic pressure does not exceed 1Mpa. The output beam intensity does not exceed 20mW/cm2 and the spatial-peak temporal-ave rage intensity does not exceed 100mW/cm2
Dimension 295W×240D×73H×mm
Net weight 1.75kg
Standard Parameter about CTG Heart Fetal Monitor:
FHR, TOCO, FM
Optional Parameter about CTG Heart Fetal Monitor:
Twins,FAS(Fetal acoustic simulator)
Other related products/Main products::
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.