Customization: | Available |
---|---|
Classification: | Imaging Diagnostic Equipment |
Type: | Corneal Topogrphy |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. The Corneal Topographer adopt PLACIDO cone, 31 rings, a total of 7936 points.
2. Through calculation and analysis, used in the clinical diagnosis of corneal astigmatism, quantitative analysis of corneal shape, display the corneal curvature by data or different colors, can display axial curvature map, tangential curvature map, height map, simulated corneal lens map and corneal 3D map.
3. Can be used in preoperative examination and postoperative effect evaluation of corneal refractive surgery, can guide wearing contact data lens, to improve the accuracy of adaptive contact lens.
Measuring Mode
|
Placido Cone
|
Coverage range of measurement
|
10.91mm (Diameter)
|
Measuring range of Curvature radius
|
5.5mm-10.0mm (33.75D-61.36D)
|
Precision
|
±0.02mm
|
Placido Rings
|
31 rings
|
Measurement Points
|
7936 points
|
Display
|
Axial Curvature map, Tangential Curvature Map, Elevation Map, Imitated Keratoscope Map and 3D cornea Map
|
Image Output
|
High-Quality color inkjet printer
|
Adjust Range
|
Left/Right > 86mm; Forward/Backward > 40mm; Up/Down > 30mm; Chinrest >50mm
|
Cornea Contact Lenses Fitting Function
|
|
Keratoconus Detecting Function
|
Other related products/Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.