Customization: | Available |
---|---|
Certification: | ISO13485 |
Working Pressure: | 0.22MPa |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Sterilizing course automatic sterilization controlled,easy to operate.
2. With drying function,suitable dressing drying.
3. With over-temperature,over-pressure auto-protect device.
4. The door opening mechanism cannot be operated until the pressure in the chamber is reduced to 0.027MPa.It can't be start on if the door doesn't close well.
5.The safety value will be open automatically when the inner pressure over 0.24MPa,and the steam be exhausting to the water tank.
6. The power will be cut-off automatically,cut-off the water and alarm when the machine lacking water.
7. Fully stainless steel structure.
Sterilizing chamber Volume |
150L φ480×850mm |
200L φ515×1000mm |
280L φ600×1000mm |
400L φ700×1100mm |
working pressure |
0.22MPa |
|||
working temperature |
134°C |
|||
Adjustment of temperature |
40°C- 134°C |
|||
Time of sterilization |
0-99 min |
|||
Time of drying |
0-99 min |
|||
Heat average |
≤±2°C |
|||
Power |
9KW/380V 50Hz |
9KW/380V 50Hz |
12KW/380V 50Hz |
18KW/380V 50Hz |
Dimension |
1400×600×1300 |
1400×670×1650 |
1400×770×1780 |
1430×880×1830 |
Transport dimension |
1550×750×1850 |
1560×820×1850 |
1680×920×2100 |
1600×1050×2100 |
G.W/N.W |
320/240 KG |
350/260 KG |
465/365 KG |
530/420 KG |
Other related products/Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.