Customization: | Available |
---|---|
Application: | Industry, School, Hospital, Lab |
Certification: | CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The instrument is fixed in an eccentric weight shaft micro-motor, when the motor rotates, the eccentric moment, and reaction to the hoop-shaped rubber suspension, so that vibration, to form a bottom, left and right, back and forth displacement movement, formed trajectories closed spiral of periodic motion, so that the reaction mass points along the track direction of vibration on the tray recess porous glass plate kept within the movement, to achieve uniform mixing. This instrument uses SCR DC motor speed control circuit is simple and reliable. The instrument is easy to operate, high sensitivity, low dosage and detection speed.
Specification of oscillator :
1, the oscillation frequency range: Minimum 25-30 (Hz) Maximum 45-60 (Hz) |
2, the vibration acceleration: X-axis (lateral direction) 0.5 ~ 1.3g Y-axis (longitudinal direction) 0.5 ~ 2g Z-axis (vertical direction) 0.25 ~ 0.5g |
3, power supply voltage: AC 220V ± 10% 50 ± 2Hz |
4. Power consumption: <10VA |
5. Timing range: 0-60 minutes |
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.