Customization: | Available |
---|---|
Theory: | Autoclave |
Type: | Ultrasonic Sterilization Equipments |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Feature of autoclave :
1.For 4~6 minutes rapidly sterilizing.
2.Digital display of working status,touch type key.
3.With 3 fixed cycles of water adding,temperature rising,sterilizing,drying steam discharging controlled automatically.
4.The whole process of water adding,temperature rising,sterilizing,drying steam discharging controlled automatically.
4.Steam-water inner circulation system:no steam discharge,
and the environment for sterilizing will be clean and dry.
5.Exhaust the cool air automatically.
6.Safe protection of water lacking.
7.Door safety lock system.
8.With four stainless steel sterilizing plates.
9.The chamber of the sterilizer is made of stainless steel.
10.Automatically shut off with beep reminding after sterilization.
11.With drying function.
Specification of autoclave:
terilizing chamber volume |
20L (φ250×420 mm) |
24L (φ250×520 mm) |
35L (φ300×500 mm) |
50L (φ340×550 mm) |
Working pressure |
0.22Mpa |
|||
Working temperature |
134°C |
|||
Adjustment of temperature |
105-134°C |
|||
Timer |
0-99 min |
Other related products/Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.