Customization: | Available |
---|---|
Classification: | Physiological Functions of Diagnosis and Monitoring Equipment |
Type: | Anesthesia |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Main body: High-strength engineering plastic rack, light,
beautiful and corrosion resistant
2.Scope of application: adult, child
3.Gas source : O2: 0.27~0.55MPa
4.Flow meter : O2: 0.1~2L/min 2.5~10L/min
5.Flow rate of rapid oxygen supply : 25~75L/min
6.Low oxygen pressure alarm : There will be sound alarm when the oxygen
pressure < 0.2MPa
7.Vaporizer : it has the function of automatic compensation based on pressure,
temperature,and flow rate. The regulation range of evaporator concentration is 0~5 vol%.
Anesthetics one can be chosen for application as required by the customer.
8.Respiratory circuit : working mode: all-close, semi-close, semi-open releasing pressure: 0.5~7 kPa
9.Respiratory bellows : bellows for adults, bellows for children tidal volume range:0~1500 ml
Ventilator:
Sustained high-pressure alarm: it will give alarm when stress have consistently been higher than 2.5 kPa |
Suffocation alarm: it will give sound and light alarm if there is no tidal volume input in 15s |
Power alarm: Power AC 220V±10% 50Hz±1Hz |
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.