• Sy-W007 Guangzhou Hospital High Quality Vet Anesthesia Machine
  • Sy-W007 Guangzhou Hospital High Quality Vet Anesthesia Machine

Sy-W007 Guangzhou Hospital High Quality Vet Anesthesia Machine

Type: Special Animal Anesthesia Machine
Breathing Pattern: Auto-Control
Animal Anesthesia Machine Control Method: Electronic Control
Gas Source: O2,Quick Inlet Port
O2 Flush Valve: 20L/Min--75L/Min
Transport Package: Carton
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
SY-W007
Trademark
Sunnymed
Origin
China
Production Capacity
300 Set/Month

Product Description

SY-W007 Guangzhou hospital high quality vet anesthesia machine 

Feature of anesthesia machine:

It is an excellent small vet anesthesia machine.

It is a light, reliable and stable machine

It can be used for vet hospital, vet clinic, research institute,

university and farmer department and so on.


Specification of anesthesia machine :
 
Gas source O2,quick inlet port 
O2 Flush valve 25L/min--75L/min
Respiration mode open mode, closed mode, semi-open and semi-closed mode 
Airway pressure gauge -10cmH2O-100cmH20 

Picture of anesthesia machine :

Sy-W007 Guangzhou Hospital High Quality Vet Anesthesia Machine
Sy-W007 Guangzhou Hospital High Quality Vet Anesthesia Machine

 

Main products:
Sy-W007 Guangzhou Hospital High Quality Vet Anesthesia Machine


FAQ:

Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
 
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
 

Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
 
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The 
price will be adjusted appropriately as the price fluctuation of raw material in 
the market.
 
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about 
7-10 days to finish the production.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now